PREMIUM modular building systems
MEDICAL MODULE
We present you an offer for the purchase of a modern medical module.
Certificates:
• TÜV Rheinland Assessment of welding processes
• GryfitLab Fire resistance
• ITB Fire resistance
What exactly are you buying?
The MTB MEDIAL MODULE is a medical module that meets all the standards of a medical center. It is also fire resistant.
A detailed inventory of the kit contents: |
---|
– Ceiling: 19.5 cm (thermal transmittance 0.15 W/m2) – EI 60 certified LBO-059-K / 9, plasterboard, mineral wool 150 mm, 3x plasterboard 15mm
|
– Wall element: thermal transmittance 0.20 W/m2 – EI 60 Certificate ITB-KOT-2018/0176, regips, regips system 3.22.00, floor 30 cm |
– Filling: mineral wool 200 mm, OSB 25 mm – fire resistance D-s2, d0 bzw. Dfl-s1 acc. to EN 13501-1, rock wool STEPROCK PLUS 30 mm, rigid E2 mm EI60, top layer 20 mm
|
– Dividing wall: 160 mm REI 120 EN 13501-2, 4 x 15 mm gypsum plasterboard panels
|
– Windows: aluminum frame (B=2628, H=1843)
|
– Doors: 3 pieces, FIRESTOP 1H C/M, 2H C/M EI60, Certificate (AT-15-8105/2010) (no. 01/2011) (ITB-1843/W), thermal transmittance: 1.3 W/m2
|
– Water system: supply through the side wall of the container with ¾” pipes, inside with PP-R pipes (according to EN ISO 15874), water heating with an electric water heater, wastewater is discharged into the container through DN 50 plastic pipes.
|
– Floor covering: GERFLOR – 69627 Villeurbanne Cadex- France, DECLARATION OF USE: EN 14 041:2004A
|
– Ventilation: electric 170 m3/h. Control by astronomical clock
|
General information
Maintaining a level foundation is the basis for defect-free installation and proper alignment of the entire set. If the support points are not level horizontally, they must be placed along the width of the frame profile. Foundations must ensure free drainage of rainwater. When setting up and spacing containers (container set), load capacity and regional characteristics (such as snow load).
Our medical units include 2 ramps to facilitate the movement of wheelchairs.
The voice information system will be programmed.
Once the module is connected to the destination, its operation will be unmanned. The operation of the module’s entrance management system is controlled internally.
It is very simple and intuitive. We recommend that you handle such situations with due care or in consultation with authorized persons.Official regulations and permits for the storage, creation and use of containers must be observed by the customer.
Technical changes are reserved!We will send you plans of any foundations upon request.
Opis
MTB MEDICAL is a model with a total area of 38 m²
With its extraordinary functionality, it offers the highest standard of
The height is as high as 3.19 meters. It allows comfortable use of the facility, it is ideal and not overwhelming.
The width and overall length is 4 m/9.51 m.
SIP panels are the elements of exterior walls, partitions, floor and roof.
Insulation layer :
At the moment, the execution time of the order, is a period of 3 months from the date of signing the contract. Implementation of the order begins with a deposit of 40% of the value of the order. Payment of the rest of the amount in the amount of 60% of the value of the order is made within three days before the departure of transport from our warehouse or personal collection.
EPS 80 – 15 cm
Parameter U 0.23
Transport
1
You don’t have to worry about transportation. We will comprehensively take care of the delivery of your order from our factory, all the way to your designated any location in the world.
If you buy more models, we calculate the required cargo space individually, taking into account one or more delivery addresses.
We handle the customs process, and we do not charge any fees for this.
Documentation matters before and during transport are organized with the help and involvement of our logistics department.
It doesn’t matter whether it is sea or road transport, our logistics department will take care of all procedures.
The cost of transportation is calculated individually for each order.
Containers should be transported with appropriately adapted trucks. Local cargo safety regulations must be observed. Containers are not suitable for rail transportation. Transport containers are fully equipped even with air conditioning filled.
2
It takes an average of 60 minutes to install a container.
Containers should stand on paved and leveled ground. For lifting and positioning the modules, a traverse of our production is used, adapted only to these containers.
After removing the transport covers, seal the holes in the floor frame with silicone.
How to place an order
1
- Search for a local distributor in our “Meet Us” section https://blcprojectcom.wpenginepowered.com/pl/o-nas/nasz-zespol/
- Contact him directly, and he will be sure to guide you through the entire ordering process up to the delivery of the goods. He will also help you with arranging the installation and handling all the paperwork.
2
- If we do not currently have a distributor in your area, please contact us directly order@mtbmodules.com
Building a house has never been so easy
FAQ
KIT HOUSE from MTB Modules is a revolution in the construction market. We are a global supplier of houses that are assembled using assembly instructions. It is also a revolution in terms of cost and construction time. Do you know any other technology that will allow you to build a real and durable home in less than a week?
If you are interested in READY MADE houses, find them in our offer.
Structurally, MTB Modules buildings are equivalent to conventional buildings. Their life span and warranties are also similar. However, the overall quality of modular buildings is much higher due to the controlled manufacturing process.
The offer is just for you. We deliver our houses to private individuals, but also to significant developers who are fed up with traditional construction technology, which causes many problems and uncertainties.
The advantages of modular manufacturing are many, but a long-term partnership provides the opportunity to invest and jointly optimize the product in order to add value whilst lowering costs.
The modules can be placed on a sleeper wall system, a concrete podium, steel podium, or a ground floor slab.
For some of our KIT HOUSE house models, we offer prefabricated floor panels, which the investor installs on concrete piles prepared before installation. All dimensions and spacing of concrete piles are sent at the investor’s request.
100% of the construction is completed inside a factory, which mitigates the risk of weather delays, allowing projects to be completed in half the time of traditional construction.
Yes. We make individual projects, but only for mass production.
Yes it’s true. SIP technology was created in the US and Japan with thought. Time has shown that houses built in this technology were the only ones to survive in a Category 5 hurricane.
Yes. SIP houses are fully mortgageable.
All elements of the set have the necessary certificates, even the smallest screws. We only use materials from the best and well-known producers.
The first houses built in this technology are over 100 years old. Over the years, the technology and quality of building materials have improved several times, which results in even better durability of these structures.
No Harmful Chemicals
The components used to make SIPs (foam, oriented strand board, and adhesive) meet some of the most stringent standards for indoor air quality. EPS foam uses pentane, a non-CFC blowing agent that dissipates shortly after projection. The foam cores have no off-gassing.
SIP walls can bear considerable vertical and horizontal loads with reduced internal studding. The load carried by the SIP is transferred to ground by the OSB skins, held in position by the fully bonded insulation core.
The sound resistance of a SIP wall depends on the thickness of the gypsum drywall applied, the exterior finish applied, and the thickness of the insulating foam core that is used. SIPs are especially effective at blocking high frequency noise, and most homeowners notice the quiet comfort of a SIP home.